Gas turbine type '9' (27 MW), waste heat boiler (70 ton/h steam) to feed a steam turbine and one steam turbine (36 MW),This train started up in 1986.It was manufactured and erected by the swiss company BROWN BOVERI (BBC) .
Gas turbine type '8c' (40 MW), waste heat boiler (70 ton/h steam) to feed the steam turbine,This train started up in 2000. It was also manufactured and erected by the swiss company (ABB),Total power generated from the power plant is about 105 MW. Part of the electricity produced from the power station is exported to the neighbouring companies (sidi kerir petrochemicals co. & gasco) the rest of electricity is consumed inside the company and the surplus power is exported to the national grid. EPC power plant also exports two kinds of steam. High pressure steam (40 kg/cm2) to Sidi Kerir Co. and low pressure steam(17kg/cm2)to production units inside the company .
Which can be exported, to new projects or for the expansion of the existing units.