Utility started at 1987 as:
Two water intake pumps (1250 m3/hr for each one).
One clarifier with capacity (2000 m3).
Two sand filters (325 m3/hr for each one).
Cooling tower 15000 m3/hr (5 cells).
Two Reverse Osmosis units (190 m3/hr for each one).
Two Demineralized water lines (150 m3/hr for each one).
Two Demineralized water lines (22 m3/hr for each one).
Two water tube boilers (45 ton/hr for each one).
Three air compressors (3000 Nm3/hr for each one).
Three air compressors (1800 Nm3/hr for each one).
Nitrogen plant (240 Nm3/hr Gas & 60 m3/hr liquid).
Two water intake pumps (1250 m3/hr for each one).
One water intake pumps (1250 m3/hr) {New}
One clarifier with capacity (2000 m3).
One clarifier with capacity (3000 m3) {New}
Two sand filters (325 m3/hr for each one).
Five sand filters (300 m3/hr for each one) {New}
Three carbon filters (150 m3/hr for each one) {New}
Cooling tower 15000 m3/hr (five cells).
Two cells for cooling tower {New}
Two Reverse Osmosis units (190 m3/hr for each one).
Two Demineralized water lines (150 m3/hr for each one).
One Demineralized water line (150 m3/hr) {New}
Two Demineralized water lines (22 m3/hr for each one) for waste heat boiler.
Two water tube boilers (45 ton/hr for each one).
Three air compressors (3000 Nm3/hr for each one).
One air compressors (7000 Nm3/hr) {New}
Three air compressors (1800 Nm3/hr for each one).
Nitrogen plant (240 Nm3/hr Gas & 60 m3/hr liquid).
Six sand filters 200 m3/hr for each one producing 1000 m3/hr filtered water for Egyptian Ethylene and Polyethylene Company (ETHYDCO).
Install Demineralized water line (150 m3/hr) at 1998.
Install five sand filters (300 m3/hr for each one) at 1999.
Install three carbon filters (150 m3/hr for each one) at 2003.
Install two micron filters (10 micron) at 2003.
Install two cells for cooling tower at 2003.
Install one air compressors (7000 Nm3/hr ) at 2004.
Install One clarifier with capacity (3000 m3) at 2004.
Upgrading control system for (boilers & DEMI & RO) at 2004.
Install one water intake pumps (1250 m3/hr) at 2015.
Install new project for producing 1000 m3/hr filtered water (six sand filters 200 m3/hr for each one) at 2015.